Our integrated EDP system collects all the relevant data of each pipe bend throughout the production path – from steelmaking to final inspection of the finished product. Each pipe bend delivery is accompanied by a detailed documentation set that informs the customer about the entire production path and includes all the reports of the tests and checks performed. Seamless traceability is thus ensured.
In all, the documentation comprises the following information: